Spec to ship in weeks Liquid, air, and commissioning solutions when the heat is on

Daedex CRAH

Mission-critical cooling in weeks

Deploy high-density cooling capacity in less time — without compromising performance, control, or integration. Daedex CRAH units are engineered for modern data center environments where speed to deployment, reliability, and scalability directly impact uptime and revenue. With capacity up to 1 MW per unit, these systems are purpose-built to support AI workloads, hyperscale environments, and high-performance computing applications. Factory-integrated controls and flexible configurations ensure a seamless fit with your facility’s infrastructure, reducing commissioning complexity and accelerating time to operation.

Designed for engineers and operators who demand precision and predictability, Daedex CRAH units deliver configurable airflow, verified performance, and full integration into existing building management systems. From white-label manufacturing to multi-color exterior finishes, every unit can be tailored to your operational and brand requirements. ETL certification ensures compliance and traceability, while streamlined manufacturing processes enable significantly reduced lead times compared to traditional CRAH systems.

  • Up to 1 MW cooling capacity to support high-density racks and AI workloads
  • Factory-integrated or customer-specified controls, compatible with leading BMS platforms
  • Upflow and downflow configurations for flexible deployment across facility layouts
  • Accelerated production timelines and ETL-certified manufacturing for faster, lower-risk deployment

A DAEDEX CRAH unit used as part of a cooling system for hyperscale and AI data centers.
DeepCool AI load banks used to promote efficiency in AI and hyperscale data center cooling systems.

DeepCoolAI Load Banks

Faster commissioning, zero downtime

Validate thermal performance and commissioning readiness with precision load simulation built for modern data center environments. DeepCoolAI Load Banks deliver scalable heat loads from 10 kW to 1 MW per unit, enabling accurate testing of high-density infrastructure before go-live. With flow rates up to 2,100 LPM, these systems replicate real-world liquid cooling conditions across hyperscale, AI, and hybrid deployments. Configurable for liquid, air, or hybrid cooling architectures, DeepCoolAI provides the flexibility required to test evolving rack designs and mixed cooling environments in a single unit — saving space and reducing costs.

Engineered for speed, reliability, and integration, DeepCoolAI Load Banks support multiple fluid types including water, PG25, EG25, and LC25 to match your facility design and operational requirements. From portable carts to full rack, cabinet, and containerized solutions, units are designed to align with your physical footprint and deployment strategy. Accelerated manufacturing timelines reduce commissioning delays, allowing operators to bring capacity online faster while minimizing risk during startup.

  • 10 kW to 1 MW load capacity, scalable for rack-level to full-facility testing
  • Up to 2,100 LPM flow rates to simulate real-world liquid cooling performance
  • Liquid, air, and hybrid configurations for next-generation mixed cooling environments in a single unit to save space and cost
  • Multiple form factors, including portable carts, rack-mounted, cabinet, and containerized systems

Move faster.

Get technical support, design specs, and budgetary quotes with one click.

    Cooling Requirements *

    When Will You Need Cooling Equipment *

    How Can We Support You * (Check all that apply)

    Plan Your Project We launch your mission-critical project in weeks

    A graphic of the steps in MAS' plan to create data center cooling systems from spec to delivery in weeks.A vertical graphic of the steps in MAS' plan to create data center cooling systems from spec to delivery in weeks.

    Other QuickShip Products Get up to speed fast with our full line of mission-ready thermal solutions

    DeepCool AI rear door heat exchangers (RDHx) used to cool data centers.

    Rear Door Heat Exchangers (RDHx)

    A DeepCool AI cooling distribution unit (CDU) used to cool data centers.

    Coolant Distribution (CDU)

    A design for modular cooling solutions used in a data center.

    Modular Solutions

    Built to Perform

    Get to know the MAS brands: Daedex & DeepCoolAI

    Daedex and DeepCoolAI operate as an integrated platform for thermal management, combining manufacturing scale, engineering depth, and rapid deployment capabilities to support data center operations across North America. With more than 700,000 ft² of production capacity in Minnesota, MAS delivers high-performance cooling infrastructure at speed and at scale. The platform offers a full range of air and liquid cooling solutions engineered for high-density data centers, AI workloads, and mission-critical environments, including AHUs, CRAHs, CDUs, RDHx systems, manifolds, load banks, and commissioning services.

    Backed by ongoing investment in advanced technologies and engineer-focused software, MAS enables faster specification, tighter system integration, and more predictable performance in the field. By aligning product development, manufacturing, and testing within a single platform, Daedex and DeepCoolAI deliver tailored solutions in days with production timelines measured in weeks. This approach reduces commissioning risk and accelerates time to operation for critical infrastructure deployments.

    The MAS Headquarters building.
    A photograph of a data center.